Share this site with del.icio.us Share this site with digg Share this site with reddit Share this site with technorati Share this site with furl Share this site with stumbleupon Share this site with google Add this site to Yahoo Bookmarks Click here to add us to your favorites Subscribe to our Feed





Shewart cycle

Definition

Four-step process used in quality control and elsewhere as a simplified method of achieving improvements. These steps are: (1) Plan: determine what needs to be done, when, how, and by whom. (2) Do: carry out the plan, on a small-scale first. (3) Check: analyze the results of carrying out the plan. (4) Act: take appropriate steps to close the gap between planned and actual results. Named after its proposer, the US mathematician Dr. Walter Shewart (1891-1967). Also called Deming cycle or plan do check act (PDCA) cycle.

Browse by Letter: # A B C D E F G H I J K L M N O P Q R S T U V W X Y Z